Moving flexible data-centre load cut energy costs by 16.64%.
Sites with on-site renewables often run controllable loads at fixed times, buying grid power while their panels export or sit idle.
GreenCode researchers found that moving flexible data centre work to match solar power cut energy costs by 16.64%.
GreenCode helps tackle this by mapping your running systems and attributing energy and CO2e to the services that cause it. You see which services run hot, and which barely run at all, before you decide what can move. More on this.
Moving flexible data centre work cut energy costs by sixteen point six four percent. Many sites have their own solar panels. But they still run flexible jobs at fixed times. So they buy power from the grid while their panels sit idle. Or the panels send spare power away. Here is the fix you can use today. Split your work into jobs you can move, and jobs you cannot. Schedule the movable jobs into the hours when your panels are generating. Tools like the Carbon Aware SDK and Electricity Maps add live grid carbon data. Set limits on how far a job may move. And measure the effect on your users. GreenCode researchers matched flexible work to solar power, and cut energy costs. The biggest savings came with more disruption. Limiting the disruption still saved about ten percent in one test. GreenCode helps tackle this by showing the energy each of your running services uses. You see which services run hot, and which barely run at all. That was GreenCode Tech Tip number fourteen. Follow for the next tip, and find more on greencode.ai/tech-tips.
Share this